Last Updated 8th December 2018 Case Type Modification Accomodation Setting Private-owned/purchasing HACC Letters of Name mihop Date of Intervention 01/06/2005 Total time Involved in provision of Intervention 55 hours Current Problems Health, Independence, Safety Expected Outcomes Health, Independence, Safety
Currently requires assistance to access bathroom
Brain tumour removed
Activities Impaired Bathing (or showering), Toilet UseEquipment Provided/Avaliable hand held shower, hobless shower, adjustable handrails, lever taps, basin with bracket, shower curtain, slip-resistant tiles, miActivities Enabled Bathing (or showering), Dressing, Grooming, Mobility, Toilet Use, TransferParticulars
Complete bathroom modification, conversion of garage to bathroom and bedroom.
Area of Residence Australia (national)Post Code 2560Accomodation Setting Private-owned/purchasingParticulars
2 storey on slab, no sewer
Plan Drawing 1
Plan Drawing 2
Reads 6891
Back